Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


220/33kv voltage level having 60MVA rating , which
transformer is preferred two winding or auto transformer.
why, kindly provide your strong technical valuable views.



220/33kv voltage level having 60MVA rating , which transformer is preferred two winding or auto tra..

Answer / raghavansa

For 220/33kv transformer two winding transformer should use.
Auto transformer should use for transformer ratio is small
2~3 like 230kv/110kv for reducing loss

Is This Answer Correct ?    2 Yes 0 No

Post New Answer

More Electrical Engineering Interview Questions

which type of oil is used as a transformer oil?

3 Answers   JSW,


what is means of CLASS in current transformer name plate?

3 Answers  


What is difference between ball screw and lead screw.

2 Answers  


difference between crane drive and line drive.

0 Answers  


three owners X, Y, z owned some tractors with them, on the first month x gave away the same amount of tractors to y and z ( as much as they possed), similarly in the 2nd month y gave of to x and z similarly by third month z gave to x and y. after this all X, Y, Z had 24 tractors each.

2 Answers   econ,


What is current chopping in CB?

1 Answers  


why we can use 1 to 5V dc

0 Answers  


Why CT secondary is grounded?

11 Answers   GE,


why single core HT cable need only one side earthing?

2 Answers  


Inductor and capacitor ........ power in one phase and ...... it in another phase. if any body found this gaps answer.please sent me to habib_eu2008@yahoo.com

2 Answers  


Explain how you intend to work under pressure to meet up with deadline target?

0 Answers  


If the capacitor bank is installed in switchyard say 132/22kv then on LT side say 22kv/0.433kv is it necessary to install capacitor bank for maintaining power factor. if pf is maintained on HT side then will that be maintained on LT side as well.if not then how&why??????/ please explain...........

3 Answers   MacLellan,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4453)
  • Electrical Engineering Interview Questions Electrical Engineering (16638)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)