Explain how you intend to work under pressure to meet up
with deadline target?
No Answer is Posted For this Question
Be the First to Post Answer
Why the colour of insulator is always is chocolate in colour?
how many types control panel of a 132/33 kv substation
when we should use Central Battery system and UPS system and why? in other words, what are the differences between the two systems?
why neutral busbar size is SAME of the phase busbar size UPTO 200A IN LT PANELS
Why we use ups battery and dsdb battery in thermal power plant
what is meant by dielectirc medium? what is the dielectirc value of air and water???
WHAT IS THE THUMBRULE FOR FINDING OUT THE CURRENT CAPICITY OF A COPPER WIRE?? 2.5, 4, 6MM SQUARE ETC...
Synchrounous motor is three phase motor,but its not self starting .why?
23 Answers Delta Beverages, KI, L&T, NTC, TVS, Wipro,
125Kva Dg can take up how much amphere load.
What is the knee point voltage of CT-100/5,15VA,5P20 ?
how to calculate the magnetizing current of ct ( 800A/1A) for Relay 64
why single core HT cable need only one side earthing?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)