Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


Give me check-list for electrical preventive maintenance of
machine tool.



Give me check-list for electrical preventive maintenance of machine tool...

Answer / mayur

1.multi meter 13.line tester
2.earth tester 14.test lamp
3.megger 15.spring balance
4.alip on meter 16.magnetic campass
5.phase sequence indicator 17.dail gauge
6.watt meter 18.wire gauge
7.techometer 19.filler gauge
8.thermometer 20.micrometer
9.grpwler
10.cell tester
11.hydrometer
12.spirit level

Is This Answer Correct ?    3 Yes 1 No

Post New Answer

More Electrical Engineering Interview Questions

what is the difference between arc and spark

2 Answers  


How would you supply a single house hold load from a 3-phase supply coming out of a sub-station?

4 Answers  


what is mean by restructuring power system?

0 Answers  


if 400kv line is connected to the load but neutral ii not be connceted then wt ll happen

1 Answers  


What is the exact minimum vale of voltage between an earth and netural which can damage or can do malfunction of the electronic equipments ? If this is mentioned in any book, pl.give reference.

0 Answers   Bhushan Power Steel,


what is the preventive @ predective maintenance

2 Answers  


how many types of Earth bits available

1 Answers  


What it is the diff btw Package & PEC AC's????

2 Answers   Emerson,


what is cathodic protaction?

0 Answers  


HOW MUCH CURRENT CAN A 3 -1/2 CORE 100 MM WIRE CARRY

2 Answers   Focus Energy, San,


L&T ACB C-POWER OF 800A FAULS TRIPING AT THE TIME OF 110KW MOTOR STARTS WITH EARTH FAULT RELEASE

1 Answers   Ambuja,


what are corona losses

3 Answers   Siemens,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)