Answer / k.prakashchandra
Contract demand is based on demand factor which to be
assessed or obtained from a similar industry.Once you enter
into agreement with the supplier ,you will have to pay the
demand charges during the entire period of agreement.If you
take the demand factor as 0.8 ,your CD will be 425 KVA at
0.85 pf..You can start with a lower value and ask for
sanction of additional CD if the MD exceeds the CD.Normally
you are unlikely to be penalized for exceeding CD during one
month ,depending on prevailing supply rules .
| Is This Answer Correct ? | 0 Yes | 0 No |
Why we use Carbon & graphite mixxed brushes in the DC motor?
Induction generator has = A negative speed B negative slip C negative voltage D negative current
model question paper for supervisor trainee
how brushless dc motor is operating ?
What is the difference between isolators and electrical circuit breakers? What is bus-bar?
If i have 200 test cases and we have to execute but we don't have time to execute all testcases.within 1 hour we have to execute that testcases and prepare the test report.so how i have to resolve this problem? is there is any technique in the testing.
what is STUB protection in tranmission system and switch yard area?
Why we say three phase voltage 440v.
Is the inductance parameter of transmission line affected by taking the earth into consideration?is the same true for capacitance? Justify the answer.
what's the activities of reactor in Buchholz relay?
we have one pumping station and 4.6 MW 7 no.s synchronous motors.so there is no required HT capacitor to improve power factor.But we have two no.s of 25 Mva power transformer connect to distribute the power for motors connect with 220 kv line.So i have required the HT capacitor to improve power factor at HT side i mean power transformer bus side.So please suggest how much HT capacitor banks required for same.
i need to connect fact device(any one from following upsc,sssc,svc,statcom and tcsc)in 14 bus system....by using MATLAB psat software....if i connect these fact devices,i will get some error as "virtual error"...i cnt rectify this error.if anybody know that how to work in psat,pls help me to rectify this error.... or send mail me to, viki0607@yahoo.co.in
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)