we are small scale industry in production of rice & rice
bran. Pls let me know how to take contract demand for our
industry.. (for information we have total 600.hp)

Answer Posted / sumeet

First of all please estimate your mill load, office load
(lighting load and air conditioner load).
As per you have shown 600 hp load your contract demand will
be 447.6 kW i.e 527 KVA considering 0.85 power factor

Is This Answer Correct ?    0 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What is the difference between UPS & inverter ? which UPS is better and whos got the edge ? what is the difference between & inverter ? which UPS is better and whos got the edge 12 V , 24 V , 36 V etc what are the advantages of 12 V, 24 V , 36 V etc and what are the disadvantages of 12 V, 24 V, 36 V etc thanks

1484


a governer in an Ic engine controls the

696


what can be the causes of capacitor start motor having a higher current that its actual

1504


What are the basic elements used for modeling mechanical translational system?

608


Why two phase welding machine is used instead of three phase welding machine.

1379






How cable from Kit-Kat to main switch, from starter to motor are designed?

1578


Tell me about ur past electrical maintanence job

1431


how to failure indution motor insulation & how to improve heat in motor insulation

1414


what is (+) and (-) in generator field detector stand for?

1384


i want to know about torque of slip ring induction motor

1700


What can you contribute to the progress of our Company as an employee if you are selected?

4880


What is the working principle of servo motor? And explain it.

1406


what could be the RMS value and average value of a 4 phase sine wave?

1417


is this the formula of building wiring to get the main breaker.Watts/volts*.8%+higher motor*(25%)=ampere. yes or no or send the correct formula for building wiring.

1175


What is the armature mmf in a D.C machine?

792