we are small scale industry in production of rice & rice
bran. Pls let me know how to take contract demand for our
industry.. (for information we have total 600.hp)
Answer Posted / sumeet
First of all please estimate your mill load, office load
(lighting load and air conditioner load).
As per you have shown 600 hp load your contract demand will
be 447.6 kW i.e 527 KVA considering 0.85 power factor
Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
What is the difference between UPS & inverter ? which UPS is better and whos got the edge ? what is the difference between & inverter ? which UPS is better and whos got the edge 12 V , 24 V , 36 V etc what are the advantages of 12 V, 24 V , 36 V etc and what are the disadvantages of 12 V, 24 V, 36 V etc thanks
a governer in an Ic engine controls the
what can be the causes of capacitor start motor having a higher current that its actual
What are the basic elements used for modeling mechanical translational system?
Why two phase welding machine is used instead of three phase welding machine.
How cable from Kit-Kat to main switch, from starter to motor are designed?
Tell me about ur past electrical maintanence job
how to failure indution motor insulation & how to improve heat in motor insulation
what is (+) and (-) in generator field detector stand for?
i want to know about torque of slip ring induction motor
What can you contribute to the progress of our Company as an employee if you are selected?
What is the working principle of servo motor? And explain it.
what could be the RMS value and average value of a 4 phase sine wave?
is this the formula of building wiring to get the main breaker.Watts/volts*.8%+higher motor*(25%)=ampere. yes or no or send the correct formula for building wiring.
What is the armature mmf in a D.C machine?