we are small scale industry in production of rice & rice
bran. Pls let me know how to take contract demand for our
industry.. (for information we have total 600.hp)
Answer Posted / k.prakashchandra
Contract demand is based on demand factor which to be
assessed or obtained from a similar industry.Once you enter
into agreement with the supplier ,you will have to pay the
demand charges during the entire period of agreement.If you
take the demand factor as 0.8 ,your CD will be 425 KVA at
0.85 pf..You can start with a lower value and ask for
sanction of additional CD if the MD exceeds the CD.Normally
you are unlikely to be penalized for exceeding CD during one
month ,depending on prevailing supply rules .
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
what about the power of wattmeter at starting and loding?
what is the maximim current drawn by 1 phase and three phase welding machine
why and where we use early make & late break contacts in protection?
1. Design a counter which counts 0, 4, 8, 2, 6, and repeats using: 1.a using JK flip flops 1.b using T flip flops 1.c using D flip flops
What is the instrument to check the rotating diode fuse of alternator in running conditions?
Give accurate definitions for these electric terms: Inductor Inductance Inductive Induction Reactance Reactive Esam Baraka ٢١ ساعة
plz send me the placement interview question and answers of whizchip(technical and apttitude)..i have an interview in next.
All the socket in a room become very hot, the Wall was also became very hot and the earth conductor also became live, what in your view might be the possible causes?
how to select electronic timer(Star-Delta) setting for diff. rating motors
draw the restricted earth fault protection circuit install on power transformer and identify its parameters and draw C/C curve of it
please tell me how a surge protector work on a DC 48Volt.? please describe briefly.
what is DRP panels?
why Lightning arrestor are made by 2 seperate stack of inslutor but why cvt are in single stack of insulator.
How to back charge the Gas turbine generator
Can you tell me more about pu systems (per unit systems )calculation in large power systems? how to get the base for voltage and power in generator, transformator and transmission lines?