In power plant synchronizing time (synchroniging meter
should be 12'o clock position only. why not 6'o clock
position not possible.
That is its normal position i.e. zero voltage position
| Is This Answer Correct ? | 1 Yes | 0 No |
how and where does star and delta connection is used ?
i have a Connected Load of 280KW and Maximum Demand of 224KW to one of SMDB under design with me. which criteria should i consider to design panel and main cables connected Load or Maximum Demand 1)Breaker rating 2)Panel Busbar rating 2)Incommer cable sizing (ignore Voltage drop)
how regenerative breaking is done in electrical traction
Why we use neutral cable just half from phase cable.Tell me briefly,please.
how the direction relay sense rhe directional fault?it's forward or reverse?
What is Cement
11 Answers ACC, L&T, Reliance Cement,
can anyone explain the star-delta motor control wiring ,which wire go where and how they operate?
I want to know what must the CT ratio be on a load of 300A is a 3PH nutral to earh installation?
What is the Basic Difference bitween Long Shunt Connection and Short Shunt Connection in DC Generator?
I completed my BE EEE degree 2006 .... which license should i apply .... ?????
Why is the generator rating always in kVA and motor rating in kW?
Why the size of transformer decreases if we increases the frequency?
5 Answers Graphics Engineering,
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)