Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


(1)The demand for electricity , the amount of renewable
generation available, the amount of fossil fuel generation
available and the cost of the fossil fuel generation are
shown in table below
period(hrs) demand(MW) renewable (MW) fossil-
fuel(MW) cost of fossil fuel(MW)
00.00 - 01.00 2000 1800 2000 30
01.00 - 02.00 2300 2500 2000 30
02.00 - 03.00 2500 2700 2100 45
03.00 - 04.00 2900 3100 2100 50
04.00 - 05.00 2700 2600 2500 45
05.00 - 06.00 2400 2000 2700 50
06.00 - 07.00 2200 1800 2000 36
07.00 - 08.00 2100 1600 2000 36

Assuming that the renewable generation incurs zero cost,
determine an optimal generation schedule(specifying the
amount of renewable generation and fossil fuel generation
used in each period, the cost for each period and the
overall cost for 8 hours.)


No Answer is Posted For this Question
Be the First to Post Answer

Post New Answer

More Electrical Engineering Interview Questions

What is different between Circuit breaker and Isolater?

0 Answers  


what percentage of marks in B-TECH is needed for section engineering exam

1 Answers   RRB,


how i chosse capacitor bank if my energy meter is 48 kvr? tell me capacitor bank chossen formula?

0 Answers   Bhel,


Give details of your interested designation, the post you are interested to serve the company better and explain why you think you can serve the company better in such position if employed?

0 Answers  


Can VFD step up to 60 Hz if it is designed to receive 50 Hz input?

3 Answers  


If stator & rotor of a 3-phase induction motor have different no. of poles, will the motor run or not??

3 Answers  


How to calculate pitch, gauge of winding wire, and No. of turns for 30HP, 3 phase, 4 poles 50Hz, 380V induction motors

0 Answers  


wht factor are considered to design ACB( air Circuit reaker) 415V

3 Answers  


define reluctance motor & its operation ?whether its operating single phase or three phase ?

1 Answers  


WHAT IS ND RELAY AND HOW DOES IT WORK?

2 Answers  


y r manufacturing fan is running into clockwise direction?y they can made in anticlock direction?pls give rply/ venkat.gattupalli@gmail.com pls send to my mail....

1 Answers  


If we impress a dc voltage of 230 V on an unloaded 230 V, 50 Hz transformer it wi A give high secondary voltage B burn out C give secondary voltage as per K D none of these

0 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)