Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


Why two main buses and one transfer bus scheme not using
for 400kV switchyard

Answers were Sorted based on User's Feedback



Why two main buses and one transfer bus scheme not using for 400kV switchyard..

Answer / rishi

first of all who told u that main and transfer bus is not used in 400 kv substation.This scheme is used in many substations.

Is This Answer Correct ?    14 Yes 2 No

Why two main buses and one transfer bus scheme not using for 400kV switchyard..

Answer / naresh.devarakonda

one and half breaker scheme is more reliable, simple
operation and reduces the no. of isolators, bus.

Is This Answer Correct ?    4 Yes 2 No

Why two main buses and one transfer bus scheme not using for 400kV switchyard..

Answer / furqan ahmad

in one and halfbreker scheme scheme both breaker and bus
maintenance is possible.even though this scheme is costly
as compared to other schemes but becoz of reliability and
redundancy it is usually used for 400 kv switchyard

Is This Answer Correct ?    2 Yes 0 No

Why two main buses and one transfer bus scheme not using for 400kV switchyard..

Answer / jkrocks

DMT scheme is used earlier in 400kV System but all new 400kv ss are made on one & half breaker scheme. it has many advantages over DMT scheme.
more reliable than DMT each time line or ICT remain connected through both buses I & II, reduces numbers of confusing isolator in system, reduce additional bus.
If one bus trip due to any fault , lines are transformer connected to that bus remains charged through another bus by means of Tie CB.

Only disadvantage is that this system require three breaker for 2 lines or transformer.
But It is nothing against lots of advantages of One & Half Breaker Scheme.

Is This Answer Correct ?    2 Yes 0 No

Why two main buses and one transfer bus scheme not using for 400kV switchyard..

Answer / teju

one and half circuit breaker scheme is more reliable than
other schemes, simple operation and reduces the no. of
isolators, some electrical parameters & it is easy to handle.

Is This Answer Correct ?    0 Yes 4 No

Post New Answer

More Electrical Engineering Interview Questions

if voltage in transmission line more than current will be more or less,if less what about the Ohm's law

2 Answers  


What is meant by directional power and reverse power relay ?

1 Answers   HAL,


in star connected 4wired transmission system ,what happen if the neutral is grounded . or not grounded. which is significant and y

2 Answers  


what is different between DIGITAL and ANALOG?

2 Answers  


if two transformers are parallel & both have fault short ckt. impedance of 50KA in each case will it increase or decrease show example?

1 Answers  


why abcd parameters are called transmission parameters

0 Answers  


1]how the voltages and frequency are achieved on ships. 2]how does the line and phase voltages are related on ships.

3 Answers  


what is per unit calculation?looking for simple and strong explanation thk u

0 Answers  


why we grounding the neutral of a transformer?

3 Answers   GAS,


which calss ct's,pt', use protection,meatering and others

1 Answers  


What kind of battries are generaly used with Disel Generator?

1 Answers   Exide,


can anyone please help me to find the rupturing or breaking capacity in KA of circuit breaker (MCCB,VCB,ACB etc) of HT and LT side of a distribution transformer...please help with detailed step by step answer...thank you

0 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)