Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


Why two main buses and one transfer bus scheme not using
for 400kV switchyard

Answers were Sorted based on User's Feedback



Why two main buses and one transfer bus scheme not using for 400kV switchyard..

Answer / rishi

first of all who told u that main and transfer bus is not used in 400 kv substation.This scheme is used in many substations.

Is This Answer Correct ?    14 Yes 2 No

Why two main buses and one transfer bus scheme not using for 400kV switchyard..

Answer / naresh.devarakonda

one and half breaker scheme is more reliable, simple
operation and reduces the no. of isolators, bus.

Is This Answer Correct ?    4 Yes 2 No

Why two main buses and one transfer bus scheme not using for 400kV switchyard..

Answer / furqan ahmad

in one and halfbreker scheme scheme both breaker and bus
maintenance is possible.even though this scheme is costly
as compared to other schemes but becoz of reliability and
redundancy it is usually used for 400 kv switchyard

Is This Answer Correct ?    2 Yes 0 No

Why two main buses and one transfer bus scheme not using for 400kV switchyard..

Answer / jkrocks

DMT scheme is used earlier in 400kV System but all new 400kv ss are made on one & half breaker scheme. it has many advantages over DMT scheme.
more reliable than DMT each time line or ICT remain connected through both buses I & II, reduces numbers of confusing isolator in system, reduce additional bus.
If one bus trip due to any fault , lines are transformer connected to that bus remains charged through another bus by means of Tie CB.

Only disadvantage is that this system require three breaker for 2 lines or transformer.
But It is nothing against lots of advantages of One & Half Breaker Scheme.

Is This Answer Correct ?    2 Yes 0 No

Why two main buses and one transfer bus scheme not using for 400kV switchyard..

Answer / teju

one and half circuit breaker scheme is more reliable than
other schemes, simple operation and reduces the no. of
isolators, some electrical parameters & it is easy to handle.

Is This Answer Correct ?    0 Yes 4 No

Post New Answer

More Electrical Engineering Interview Questions

What is the meaning of In,Io & Ir in Circuit breaker? How to calculate?

1 Answers  


what is shunt trip coil? what was the function in rmu?

1 Answers  


we convert 66kv to 33 kv to 11kv to 440v. why can't we directly convert 33kv to 440 ?

9 Answers   EMC, Jakson, L&T,


Which motor runs on both ac and ac? a) dc series motor b) reluctance motor

2 Answers  


what is the transformer rush current?

0 Answers  


Why generator field rheostat is set to maximum position and motor field rheostat is set to minimum?

5 Answers   Bhel, College School Exams Tests, TCS, Texas,


In tranformer winding Connection Like Dyn1 ,so LV lags Hv by 30 deg and Dyn11 LV lead HV by 30,so how do this lagging and leading afffect the transformer??

2 Answers   Siemens,


v=r*i this means when voltage increases current also increases at constant resistance.... p=v*i this means when voltage increases current decreases to maintain the power constant which one is true...

3 Answers  


why ct secondary side shortlink provided? its open what will happen?while running ?

2 Answers   Essar,


how much leakage current is allowed in MC61A L&T make relay?

0 Answers   Siemens,


which transmission is cheaper ac or dc?

10 Answers  


What happens when the polarity changes in CT? Explain briefly?

4 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4453)
  • Electrical Engineering Interview Questions Electrical Engineering (16638)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)