Why two main buses and one transfer bus scheme not using
for 400kV switchyard
Answer Posted / naresh.devarakonda
one and half breaker scheme is more reliable, simple
operation and reduces the no. of isolators, bus.
| Is This Answer Correct ? | 4 Yes | 2 No |
Post New Answer View All Answers
In what condition the HT fuse breakes?
11 kg trivevter meter has rating of -/5amps. And pt ratio11000/110v and is connected with 11kv ct/pt unit of cr ratio 75/5amps. And pt ratio of 11000/110v while checking accuracy of meter with HT Accuchek meter what value of PT ratio and CT ratio to be filled in Accuchek meter
how is calculated the quantity of weight in hot test xlpe?
How i can decide that HVDC line is best for transmission.
How to calculate the value of earth capacitance in a transmission line.
in dc series motor if field wdg is shorted then
What are locations arc protection relay is fixed.
What is Tachometer used to measure?
What are the types of transformers according to the arrangement of iron cores?
WHat is the requirement of installing FAST ACTING EARTH SWITCH in GIS and how is that integrated with protection system. How and when does it operate?
what is the effect of higher value of GD???
How to Decide(calculate) Bush bar size for copper and aluminiam ?
is ac supply can store
WHAT IS THE DIFFERENCE BETWEEN GENERAL INVERTER AND SOLOR INVERTER TELL ME PLZ
State thevenintheorem?