Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

Why two main buses and one transfer bus scheme not using
for 400kV switchyard

Answer Posted / rishi

first of all who told u that main and transfer bus is not used in 400 kv substation.This scheme is used in many substations.

Is This Answer Correct ?    14 Yes 2 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What is sink and source?

1166


what is the transiant condition in alternator? and how it can be prevanted?

2071


What is Antipumping Function & If we have C.T how we find the Ratio ?

2009


Can Anyone suggest the Standards (IEC or IS) for selecting copper current density?

1383


what is the id1 & id2 setting in differential protection relay of CSPC?

2776


how will we calculate the copper wire load..

1910


1600kva capacity Transformers how the bucholz relay,Oil temperature,winding,surge relay relays setting are to be done

1880


dear sir/madam i want to get some knowledge about RRB EXAMINATION(section engineer) 1- what is minimum cut off 2- wht portion is major portion . 3- can any body provide Sample paper. thanks & regards ashish

2338


in the case of 6.6kv motor starter combination contain fuses on it VCB. but in 11KV motor starter combination Fuses are not using in it's VCB why?

2255


ELECTRICAL ENGINEER TEST IN FEWA ANY ONE HAVE KNOWLEDGE ABOUT THIS?????????

1014


what is the isolation transformer. what is the isolator?

2054


What is primary and backup protection?

1144


when ID fan will immediately stop through VFD what exactly cause and problem the ID fan

1427


why various test are performed on electrical panels & power cables before commissioning on site & what are these test???

1971


i need to now what will be the cable size to the following load, transformer to distribution panel distance 110m, load 1000kw, voltage 400v, pf 0.85, permissible voltage drop 2.0%, overhead line, atmospheric temperature 35 degree c.

1601