Why two main buses and one transfer bus scheme not using
for 400kV switchyard
Answer Posted / teju
one and half circuit breaker scheme is more reliable than
other schemes, simple operation and reduces the no. of
isolators, some electrical parameters & it is easy to handle.
| Is This Answer Correct ? | 0 Yes | 4 No |
Post New Answer View All Answers
How is magnetic leakage reduced?
wHAT IS CAPACITANCE LATCHING? hOW TO CALCULATE CAPACITANCE LATCHING? hOW TO SOLVE THE PROBLEM IF CAPACITANCE LATCHING APPLIED?
working principles of cf lamp,incandescentlamp and f lamp?
what is cause of static electricity? I experience shock when i touch metal equipment in a room ,furher check shows earth leakage showing 80ma at the DB near to the 400 MCCB?
how open delta PT works & what is its construction?
i installed 100kva ups. what KVA genset they should provid in input side? plz any update formula or ans with reason.
what's the difference between abs/inc encoders. apart from the position remembrance what are all the other differences. and what's mean by grey code.
why is a power transformer used only occasionally?it is used to step up at generating stations?and that needs to be done all day long !!!!!!!
What is the necessary and sufficient condition for stability.
whats the differece between Exd and Exe
Explain in brief description about the operation of DG sets.
i need project topics along with circuit diagram in the electrical and electronics engg and also some websites regarding projets.
WHAT IS DEGREE OF COMPOUNDING IN D.C MACHINE MEANS? HOW TO READ THE OPERATING CHART FOR ANY ELECTRICAL MACHINES?
How calculated single phase induction motor req. Capacitor?
Explain Need of a starter in a dc motor.? Also explain any two starting and speed control method of dc motor?