Why two main buses and one transfer bus scheme not using
for 400kV switchyard
Answer Posted / furqan ahmad
in one and halfbreker scheme scheme both breaker and bus
maintenance is possible.even though this scheme is costly
as compared to other schemes but becoz of reliability and
redundancy it is usually used for 400 kv switchyard
| Is This Answer Correct ? | 2 Yes | 0 No |
Post New Answer View All Answers
What is acsr cable and where we use it?
some basic standard questions on transformer.
Is it possible to download the Siemens Selection Chart(TYPE 2 coordination) for 1) fuseless selection 2)Fuse selection
In a tap changing transformer where is the tap connected, is it connected in the primary side or secondary side?
How to calculate flow of water delivered by pump when pressure & size of pipe line is given
Brief working principle of stabilizer,application & safety precautions
What is reactive power and where it is used.
How much inductance or resistance require as a starter in series with induction motor of specific capacity(e.g. 5 hp) ? What is formula for it ?
ACB & VCB how do work and saftes and how can maintenance in this and parts name show with picture
This is urgent!! What is a Thyristor-based 3-ways selector switch with Zero crossing control? how does it operate and where is it mostly found in a system?
What is dynamo function in DG sets and draw block diagram?
2. A current i=(10+10 sin t)amperes is passed through MI type ammeter. its reading will be.........
How to calculate the input cable rating for 10kva ups (3phase input and single phase output and also 3phase output, battery rating 65Ah)provide the formula also.thnx
234 MVA Generator 3 phase Short circuit current Values required? Gen set Rating-234 MVA, Gen Voltage-18kv, PF;0.8, Xdv:23.5 %, Transformer Rating-18/380KV, 680MVA,Yndd1 two winding, Step up TR, ZT:35.50 %,X/R 4.33 Gen CB Position, CB open ,Disconnected open, Generator Running Voltage 18 Kv, Bi mistakes generator side earth switch Closed during that time short circuit current level in 3 Phase required, and how to test on site 234MVA Generator Short circuit current,
What will be the current if the resistance total in a series circuit doubles?