Dir sir we have 750 kva Caterpillar dg set we are fas on
different problem we start dg set ofter 1 mint apply load
around 500a dg was run one or 3 mint after 3 mints dg was
shutdown automatic how to face tis problem

Answers were Sorted based on User's Feedback



Dir sir we have 750 kva Caterpillar dg set we are fas on different problem we start dg set ofter 1..

Answer / a.sundar

check the control wirings

Is This Answer Correct ?    0 Yes 0 No

Dir sir we have 750 kva Caterpillar dg set we are fas on different problem we start dg set ofter 1..

Answer / afzaal

it seems no issue with prime mover as it starts smoth but some protection make it trip..do check that...weather overcurrent(overload)...u have not mentioned voltage? do mentioned that

Is This Answer Correct ?    0 Yes 0 No

Dir sir we have 750 kva Caterpillar dg set we are fas on different problem we start dg set ofter 1..

Answer / k.prakashchandra

Check the prime mover.

Is This Answer Correct ?    1 Yes 2 No

Post New Answer

More Electrical Engineering Interview Questions

if an insulated power and control cables of a running gas diesel gensets laid direct in an open trench i.e, trench bed is not rcc of a power house in which rain water, spillage water alwas exists and all power control cables remains submerged even when gas gensets of 480 kw each runningin on load. These power &control cables runs from power house to switchgear room through these trenches in which water remains most of the time. pl explain its merit & de-merit

0 Answers  


How to choose size of the cable w.r.to current carrying capacity ...

0 Answers   L&T, Saams,


WE HAVE THE DC RECTIFIER 1500A, INPUT VOLTAGE IS 3 PHASE. HOW TO CALICULATE THE LOAD? 3 PHASE SIDE EITHER dC SIDE. PLEASE SUGGEST ME

0 Answers  


which type your UPS on line,off line give the reason?

2 Answers   Roto Power,


what is the purpose for open delta connection in potential transformer

2 Answers  






How we can determine short circuiting current any plant and for example a plant which power generation is 415 volts and plant load is 500 kw.

0 Answers  


how much earthings are mendatory at a 25kva sub station?

3 Answers   Bhel,


What is pd controller?

0 Answers  


What is the function of isolater

4 Answers   Getco, Gland Pharma,


what is Real power and Reactive power ? what is difference between them ?

5 Answers  


difference between generator and alternator

0 Answers   Havells,


Which Class insulation is prefered for the sandwich Busducts ? Why?

0 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4451)
  • Electrical Engineering Interview Questions Electrical Engineering (16632)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)