Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


What are the difference between off-load tap changer and
on-load tap changer in transformer?

Answers were Sorted based on User's Feedback



What are the difference between off-load tap changer and on-load tap changer in transformer?..

Answer / g.trinadh

In off load tap changing transformers tap is changed after discharging of load on LT side where as in on load tap changing transformers tap can be changed with out discharging load on transformer.

Is This Answer Correct ?    17 Yes 1 No

What are the difference between off-load tap changer and on-load tap changer in transformer?..

Answer / vinoth kumar.n

In off load tap changer the transformer will be in off
condition,it safe for equipment and personal safety,,

In on load tap changer the transforme will be in running
condition,there is no interruption of power supply,but
there is unsafe for windings.

Now a days 230kv are and above prefering only off load tap
changer,The tap changer provision will be held on HT side
only.

Is This Answer Correct ?    3 Yes 7 No

Post New Answer

More Electrical Engineering Interview Questions

How dc generators direction can be reversed ??

2 Answers   GPSC Gujarat Public Service Commission,


What is Control & Relay Panel? And Remote Control Center?

0 Answers   L&T,


why should series motor be started with load and shunt motor should be started without load??????

7 Answers  


how to calculate the earth mat design in 132 kv substation yard ????

0 Answers   Divis Laboratories, KSEB, SWPL,


why ahould you show client/engineer activities clearly on the project plan

0 Answers  


In our factory there is one no. of Series trip HT 6KV OCB. 1. Is it possible to measure CT out put current by 440V Clamp meter? The measurement is required for knowing the exact value of current in CT secondary to set up protection for transformers. 2. plase forward the single line diagram of AMF panel?

1 Answers   HAL,


why secondary of open delta pt (two element pt) centre tap is earth what happen when this earth is removed

1 Answers   Essar,


Can transformer develop three phase power from a single phase source?

12 Answers   ONGC,


how does the switching of capacitors in a capacitor bank take place when we use them at the load side to reduce the power factor?

2 Answers  


In a synchronous machine if the field axis is ahead of the armature field axis then the machine is ?

1 Answers  


WHERE to use CVT & PT.

11 Answers   Suzuki,


where can the transformer having vector group Yny0 be used??

0 Answers   GK Power, NEA, Petrotech,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)