Dir sir we have 750 kva Caterpillar dg set we are fas on
different problem we start dg set ofter 1 mint apply load
around 500a dg was run one or 3 mint after 3 mints dg was
shutdown automatic how to face tis problem
Answer Posted / a.sundar
check the control wirings
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
Please give me a erda placement paper
What is meant by reset level of the relay?
in india per day how much power is generated including all power station
Match the following a)(X'+Y') b)X'Y' C)XY 1)NAND 2)NOR 3)Carry
wht is embedded systems? what is new inthis field?
how can i get an electrical c-certificate?
Explain the operation carried out in thermal power stations?
How is the percentage impedence of a transformer fixed at design stage???
1 “earthing” for bonding of equipment and circuits to common plant earth electrode potential, 2 “protective earthing (PE)” when this bonding is required for personal safety provisions 3 “grounding” for interference suppressing bonding of screens, sys-tems with ground level 4. low-impedance earthing ? 5.primary earthing system and secondary earthing system what is that? 6.earthing electrode or mesh net earthing electrode ? very confusing , simple but very informative help required ? i will be very very thankful to you guys.
what is the difference between vector scale and vector diagram?
How to select the proper VSD to operate high inertial load
if a number of plc s are there then how many modbus to be used
Is it possible to implement Restricted Earth Fault protection for a transformer without neutral CT?
how to carried out tan delta test in 11 KV alternator ?
what is the meaning of WYE and DELTA in Electric meter?