which pole motor is best ?4 pole motor or 6 pole motor,why?
Answers were Sorted based on User's Feedback
Answer / rajeshsan
The selection of 4 pole or 6 pole depends on application and speed.
To explain in detail
speed, N = 120f/p
where,
N
f = frequency
p=poles
From above it was clear speed depands on frequency and no of poles.
| Is This Answer Correct ? | 5 Yes | 1 No |
Answer / shyamkr
actually this depends on the operation of the motor.in most
of the cases 6 pole motor are more beneficial since we get
close wave form of flux as compared to the sine wave.
but when explanation is needed for the motor operation then
4 pole motor is very easy to understand.
| Is This Answer Correct ? | 0 Yes | 2 No |
what is the d/f b/w dol & star delta starter.
As we know,charged clouds(from which lightning stroke initiates)may be charged with either +ve charge or -ve charge. Now say one cluster of cloude is fully charged with +ve charge & another cluster is fully charged with -ve charge. In the sky these two cluster of charged clouds have come in such a distance that, if they come clouser by some few yeards then the lightning discharge will take place between these two cluster of clouds. Under such a situation an Aircraft came inbetween. what happend??
why the electrical plug point pin(earth) size in max
1 Answers Autoneum Nittoku, Bajaj,
1)how many types of earth? 2)how many types of megger and how to select that range? how much time taken for megger calibration( we r using megger)
what is the usage of microcontroller in the panel board?
11 kv metering is done in my factory.Meter show PF 1.000 but kvarh lag&lead show 24&94 respectively & Avg.PF is .956 .? is what i do for inproove my PF to 1.000
I'm looking for a manual set for a Credence ASL-1000 or ASL 3000. Softcopy would be preferred but I'll take what I can get.
what is the current law ?
what is the IEC standard for Power Cable installation in onshore (like in direct buried ground or above groung)
what is multiplying factor of a energy meter connected with a CT ratio of 600/5 and voltage at 415 volts.
Is it required to lay GI wires along with GI/MS conduits from one point to another point though separate earthing cable is conncted from DB to Socket?
what is the different betweem earthing and neutral?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)