Please tell me present is code no for steel structure work.
Thanks.
Answers were Sorted based on User's Feedback
What was asked in isro civil interview
why are you joining in this (applied post) job and your aim for this job
if any chance to getting a set of solved major building estimate with the drawing.(soft copy)
How will you provide reinforcement from corrosion?
what is the quantity of concrete required in 1 cubic meter volume without reinforcement
How gate result to cube for 7 day? Formula for the cube testing?
1 Answers Ambuja, Indiabulls, Legacy,
A bill was raised by contractor which read as follows 1.) Excavation in normal soil upto 1.5m - 250 cum 2.) Excavation in normal soil 1.5m to 3m - 240 cum 3.) Excavation in soft rock - 350 cum 4.) Excavation in hard rock - 250 cum 5.) Filling with available soil - 825 cum 6.) Filling with bought out soil - 1100 cum How can I verify the above quantities, especially for item no. 5 & 6? What checks are necessary before releasing the bill ?
how to find the percentage for minimum reinforcements as per IS:456 for beam , column, slabs.??
a) we have 30nos., 300mm dia, 4m length double under reamed piles.calculate excavation quantity.b) tell concrete qty. also.
What is the wall thickness of NP-3&NP-4 hume pipe as per I.S code
specific gravity of block cotten soil, normal, rockysteta
what is Quality Reporting?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)