Please tell me present is code no for steel structure work.
Thanks.

Answer Posted / vidya

Is:800-1986

Is This Answer Correct ?    1 Yes 2 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Test procedure of fly ash bricks as per code ?

2120


How to find the cuplock pipe qty in staging for Minor bridge?

691


how much concrete solid/hollow block are manufacture per 50 kg cement bag in differnent sizes like 400x200x200mm, 400x200x150mm, 400x200x100mm. And need proper ratio as per sale quantity. pls send my mail mathi7599@gmail.com searching last two years not yet get pls find and enclosed pls. need practical analysis.

2239


Why does the pressure increase under soil?

646


Technical Question of Civil Engineering

1888






Ratio for 4500 psi concrete

1177


What are the ingredients of pre-stressed concrete?

769


Are you ready to relocate with your immediate family to United States as a new employee?

4871


Can we use concrete of slump cone in cube casting in which we have already measured slump?

1261


pls give me some basic informations in construction of a structure?

1603


Why is concrete cube test carried out?

762


how many BSCs can i connect to the HUAWEI MSC

1832


How much river sand contain the 6 & 10 wheeler truck? Or Maximum sand that any type of truck carry?

4496


what is meaning of inverted beam.is it way to provide double mat in slab one at bottom and another at topif we go for provision of inverted beam. shall we construct structure with out plinth beam for us we have to construct small bus shelter

2019


Why do we not deduct steel volume to find actual volume of concrete in practical as we have studied that,,, actual volume of concrete = volume of column- volume of steel pls explain with reference of IS code?????

1608