Please tell me present is code no for steel structure work.
Thanks.
Answer Posted / pvsnrao
IS800:2007
| Is This Answer Correct ? | 11 Yes | 2 No |
Post New Answer View All Answers
What are the responsibilities of a site manager?
what is yield and tensile strength of steel, if steel has yeilding strength of 60 psi than how much its tensile strength?
Labor requirement for each item needed? Lean Concrete 103.550m3 Concrete for Foundation and Structure 1753.000m3 Expansion joint 288.000m Contraction joint 127.000m Dowel bar 450.000m
You have 3 snd sample of different FM=0.21,FM=0.95,FM=2.90 which one is suitable for a)plastering on R.C.C b)plastering on masonary wall c)concreting column d)concreting of bored pile.also justify your answer.
how we calculate the grade of the Bituminous materials.?????
What should be the maximum allowable time for placing ready mix concrete? The specification requires concrete placement within 90 minutes of batching at the plant. What is the significance of this 90 minutes & should this be used as a rejection criterion? What effects does the concrete has after that time period?
What are the uses of alloys in daily life and how are alloys made?
could u tell me how to used deform stell bar in reinforce concret?i wanna know the general using in the site!
4. Differentiate between NC and OC soils. Draw curves for (i) Stress vs Strain (ii) Volume charge vs Strain (iii) Pore pressure vs Strain for these soils
Define line type?
What is the crank length in the slab?
What is the use of extruded feature in solidsworks?
How many days should curing of plastering, brick work and concrete
how pumping of concrete effects the quantity of material used in it?
how to stop beam concrete between column