dialation means
No Answer is Posted For this Question
Be the First to Post Answer
What should be the maximum allowable time for placing ready mix concrete? The specification requires concrete placement within 90 minutes of batching at the plant. What is the significance of this 90 minutes & should this be used as a rejection criterion? What effects does the concrete has after that time period?
how to calculate the no. of brick (18'*9'-wall)
In tower foundation, on the time of 3 mtr pit RCC casting if water and mud is their surface of PCC then what will be do?
how to calculate the mortar for 10'*10' size room for both plastering and for masonry work?
0 Answers Bhoomi Engineers Builders,
For removal of formwork of simply supported slab / beam from where to start the deshuttering? ( Max Bending moment of the simply supported beam is in the center hence is it required to start from the supports?)
How to calculate 45 degrees bend Steel bar length in Slab Reinforce ment
12 Answers JBS Builders, L&T, Rajarathnam Construction,
VAT and CST ? Which benefits for buyer ? Why benefits?
How do piles bear loads
Which prize is the alternative to the NOVEL Prize?
In 250x250mm cube, how much there will be cement,sand,water,and gravel
what is the function of fineness modulus to determine the concrete mix?
Should column area deducted from form work measurement of slab in building?
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)