Please tell me how many bricks needed for 4.5" bricks per
m3(how to calculate this also), and outurn of mason. Thanks.

Answers were Sorted based on User's Feedback



Please tell me how many bricks needed for 4.5" bricks per m3(how to calculate this also), and ..

Answer / haris iqbal

frist calculate  total volume of your brick work

 VOLUME OF TOTAL BRICK WORK=   L*B*H

 NO OF BRICKS = total volume of your brick work * 13.5(one

 cubic feet of work requried 13.5 bricks including mortor)

Is This Answer Correct ?    1 Yes 0 No

Please tell me how many bricks needed for 4.5" bricks per m3(how to calculate this also), and ..

Answer / santosh singh

you calculate total volume of brick work = L X B X H

L= LENGTH
B= BREADTH
H= HEIGHT

THEN CALCULATE VOLUME OF ONE BRICK WHATEVER MAY BE THE SIZE
OF YOUR BRICK= L X B X H

NUMBER OF BRICKS = TOTAL VOLUME OFBRICKWORK / VOLUME OF ONE
BRICK

Is This Answer Correct ?    8 Yes 8 No

Please tell me how many bricks needed for 4.5" bricks per m3(how to calculate this also), and ..

Answer / md.hedayetullah

Firstly decide brick size=L X B X H=.23mm X.115mm X .075 mm
Number are brick in use=1/.23*.115*.075=504.09 bricks
Less two percent of cement mortar=504.09*2/100=10.08

Actual use nos of brick in 1cum=504.09-10.08=494 nos

Is This Answer Correct ?    1 Yes 1 No

Post New Answer

More Civil Engineering Interview Questions

explain what do you mean by the property development.

0 Answers   SVS Constructions,


what is pouring and explain

0 Answers  


what is the method used for marking of cantilevers in hirise buildings by using theodolite

0 Answers   Aditya Birla,


For M25 concrete ,what is the maximum compressive strength at 28 days ?

6 Answers   L&T, Techno Builders,


Which is default or standard size of tiles used in dado bathroom

9 Answers   Orbit Corporation,






What is the difference between face reinforcement and distribution bar in a concrete structure?

2 Answers  


Define graphics window?

0 Answers  


what is the salry which I am expect in kolkata for diploma in civil engineer with 3 years 6 month exp.???

6 Answers  


WHAT DO YOU MEAN BY MIX DESIGN OF CONCRETE?NAME THE VARIOUS METHODS OF CONCRETE MIX DESIGN.EXPLAIN I.S.METHOD OF MIX DESIGN

0 Answers  


why 50% more is assumed while calculating dry volume of coarse and fine aggregates in concrete calculations.whether 50% more is correct? How is it decided? whether the same is applicable to cement volume. Also what about cement mortar dr volume? How much more is to be considered for dry volume of mortar.

1 Answers  


How to calculate canal slope curvature qty!

0 Answers  


what are the types of dams

3 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4451)
  • Electrical Engineering Interview Questions Electrical Engineering (16632)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)