hi this toufik here. i am doing my b.e.degree.now i am in
final year and supposed to do a project in this year so i
thinking to control the buchholz relay using software base
means checking the status of transformer oil using
microcontroler, plc or scada. so can i do so...??? alz
suggest me...
Answers were Sorted based on User's Feedback
Answer / k.prakashchandra
You can have a gas analyzer inside the relay
| Is This Answer Correct ? | 2 Yes | 0 No |
ya toufiq.. i think u can do it.. but it seems in terms of relay, u r required to use more voltage n current.. in this interrupting with micro-processor r controller.. i think it may b difficult..anyway it s a good idea.. analyse ur doubts wit ur staff who know abt mp clearly.. all d best man..
| Is This Answer Correct ? | 1 Yes | 0 No |
Convert a star connected network into a delta connected network.
ELCP USE IN 3 PHASE SUBMERSIBLE PUMP? THEN USE 3 POLE 0R 4 POLE?
why actual valve timing diagram is different than ideal valve timing digram of a 4 stroke engine?
what is v/f control in VFD?
how we design a pannel to start 10HP motor with the help of star delta starter?
what is armature reaction?explain in simple words?and what is its infleunce on dc motor
HOW THE AC GENARATOR CAN GENARATE REACTIVE POWER,HOW CAN WE CONTROL IT.AND OTHER SOURSES OF REACTIVE POWER GENARATIONS ARE WHAT.
Dear all, is ther any body who can tell me about the setting of ACB(air circuit breaker ). what kind of it,s setting is and how to do it,s setting. also please tell me the setting of VCB(vaccume circuit breaker) . please tell me their setting,s. i will b very thank ful to all of u. Thank,s and Regard,s. Muhammed Ikram.
hi frienda We have 250kva cater pillet dg set we are fasing one diffrent proublam in dg we are start dg set after one mint applying load around 450a load but dg was run 3 Or 4 mints after 3 mints dg was shuding down automatic how to face this proublam pls tel any budy
exolain the star delta connection
What is the meaning of BREAKING and MAKING CAPACITY in case of CIRCUIT BREAKERS.
How to calculate the electrical load for a standard telecom BTS shelter and capacity of DG set required to cater to this load?
3 Answers Bhel, INDUS, Indus Towers,
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)