How to calculate the sand and aggregate in concrete
Answer / ajay saini
this is incomplete question .First of all you ought to know about the grate of concrete and the mix proportion of concrete.if this is M-10 then 1:3:6 ration will be followed here 1 is for cement 3 is for sand and 6 is for aggregate.
| Is This Answer Correct ? | 10 Yes | 2 No |
What is structural frames or systems?
Why do we use steel in Column? Why HYSD bar is preferable than plain bar?
how do i remedy a foundatiom that the column bases was cast and aftet 28days crushing the conprehensive strength of the concrete fall below the specification 25N/mm2
what is the basic difference between Coloumn & Shear Wall
CALCULATE QUANTITY OF RCC COLUMN
What is an object snap mode?
cement mortar 1:6 explain the cement and sand coefficient calculation?
The slenderness ratio of a column is zero when its length ??
Analyze the rate for 1st class brick work in superstructure with 1:6 cement sand mortar. Consider 1000 cu.ft quantity and work out the rate per cu.ft
Till how many days can we keep a cement bag without using? And on what conditions the cement will get spoiled?
hai.... please any guide me were i can get interview questions& ans for Unigraphics
What is the difference between opc cement to ferro cement
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)