How much binding wire is required for one tone reinforcement ?
Answer Posted / mohammed aijaz hussain, modi b
Generally 4.5 kg to 5 kg of binding wire is consumed for
binding 1 Metric Tonne of steel and for Columns 1.5 kg is
consumed.
| Is This Answer Correct ? | 12 Yes | 12 No |
Post New Answer View All Answers
why we are useing plastic under the lean concrete?and whts the advantage?
how to calculate the weight of concrete
Whats be the minimum foundation depth of multistoried building as per height of building in individual footing?
Discuss some applications of modular elasticity?
what else we can add rather than admixture in concrete to reduce the cement quantity?
In block work seawalls what is the purpose of slip joints?
manhole chamber having height of 2300 mm and thickness of brickwork is 230 mm and dia of opening covering is 560 mm and bottom length vertical is 1500 mm (1:4) brick masonry and plaster 12 mm on both sides..how to estimate the no bricks used with mortar cement bags and sand for total chamber including plaster.
what is zone a n zone b?why the spacing of ring in zone a less.n zone b high?
how to determine H- zone in a column? where it will occur?
what is the difference between natural draught cooling tower and induced draught cooling tower
What is the material consumption- cement,sand,tiles etc for Toilet dado?
how to caluclate sienerge qty in construction in ap
que.is ideal size of bricnk use in india,joint size of mortar in massinary ,how many bricks used in 1cum.how to test at site.what is the possition of marka used in bricks?
How does a traffic light signal work ?
undistributed samples are obtained by