What is the role of a PMC(project management consultancy)
in any construction work?

Answers were Sorted based on User's Feedback



What is the role of a PMC(project management consultancy) in any construction work?..

Answer / vai

PMC is like a mentor for contractors work reporting it to client. this a kind of assurance which is given to client from PMC tht work done is correct and in order. PMC will c if the work is going according to schedule, look out for any problems which may arise in future... etc..

Is This Answer Correct ?    57 Yes 7 No

What is the role of a PMC(project management consultancy) in any construction work?..

Answer / uttam

PMC's primary role is to lead, guide, coordinate and
synchronize the professional inputs from various specialist consultants. It is also includes monitoring, controlling, solving problems, conflicts management and making decisions. His role is multi-disciplinary and his responsibility is to
synthesize and integrate all the aspects of a project into a cohesive whole. The PM role is to lead, guide, steer, inspire, and motivate his entire project team and to marshal all necessary resources to implement and manage tasks and
activities in order to achieve milestones and project deliverables, usually in terms of time cost and quality in order to ensure project success, avoid or reduce project
failure altogether.

Is This Answer Correct ?    39 Yes 3 No

Post New Answer

More Civil Engineering Interview Questions

why provide water stopper in costruction joits

1 Answers   L&T,


Can anybody help me by attaching files , formats for quality checks of common building materials like cement , concrete , bricks , sand and aggregates? Regards,

45 Answers   CDS, L&T,


What is the difference between lap splice length and development length of rebars?

4 Answers  


steel which is used for reinforcement and structures why they are directly used why GALVANISATION or PRIMER is not done to prevent from corrosion

1 Answers   ITD, L&T,


To construct 100sq.yard what will be the cost in detail pls

2 Answers  






what is difference of NP3 and NP4 pipe and what is the thickness of 1000mm dia NP4 pipe

1 Answers  


what will be hook length of stirrups

7 Answers   Rawabi Fayfa,


why top layer of block work shoud be full size if any cut block adjustable than another layer?

0 Answers  


How many kilo of binding wire required for one ton of reinforcemet steel binding?

17 Answers   ECCI, L&T, Shri Janani Homes,


how to Concrete cubes testing curing time 7 days casting date 24.05.17 testing date ?

0 Answers  


What are the tests on concrete?

1 Answers  


WHICH BOOKS ARE AVAILABLE FOR CIVIL MPSC

2 Answers   BMC, L&T,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4451)
  • Electrical Engineering Interview Questions Electrical Engineering (16632)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)