Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


how much weighs a square feet of slab of 5 inches thick

Answers were Sorted based on User's Feedback



how much weighs a square feet of slab of 5 inches thick..

Answer / nknehru

Weight per SQ ft of RCC slab 5 inch thickness will be 29.50 Kg ( .305 *.305*.127* 2500 ).

Is This Answer Correct ?    3 Yes 0 No

how much weighs a square feet of slab of 5 inches thick..

Answer / srinivas

29kgs. How .305*.305*.125*2500kg

Is This Answer Correct ?    2 Yes 0 No

Post New Answer

More Civil Engineering Interview Questions

PL.tell me about civil engineering questions with answer

0 Answers   Construction, L&T,


What are the disadvantages while using stone dust as filler in pavements?

0 Answers  


what is difference between active and passive earth pressure. how it effect the retaining wall design ?

4 Answers  


Slab quantity 

0 Answers  


whaat is blister in box girder bridge and what is its function..

0 Answers  


what is the approximate density in kg/m3 of compacted hardcore for building foundations

1 Answers   Era Infra Engineering,


in plate load test what is the thickness of plate 20mm 5mm 50mm none

0 Answers  


Clarify the out turn of steel fixer in construction field

2 Answers  


how to calculate the lap bar for bor culvert ?

1 Answers  


What is the frequency of sampling for the materials of cement,Fine aggregate, Coarse aggregate .and refer which code

0 Answers   IVRCL, Techno Art Constructions,


HOW SOON CAN YOU TRAVEL DON TO ANY LOCATION POSTED U?

0 Answers  


As per Method of measurement how to calculate no of column stirrups (ie: upto slab bottom or beam bottom)

1 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)