Pls help me to arrive the rates for centering shuttering for
highbay using H-frames?


No Answer is Posted For this Question
Be the First to Post Answer

Post New Answer

More Civil Engineering Interview Questions

how much quantity of water is required for main wall brick work, partition wall brick work,and for internal and external plastering and how it is calculated?

1 Answers   LiveCon, Sobha Developers,


the internal dimensions of a ware house are 15m *5.6m and the maximum height of piles is 2.70m find the maximum numbers of bags to be storedin two piles

1 Answers  


neutral axis more than the critical neutral axis then rainforcement in rcc beam belong to over or under rainforcement

2 Answers  


what is the density and bulk density of cement?

3 Answers  


y we need to take 28 days strength as compressive strength ? y cant we take 30 th day

2 Answers  






What is the difference between stress and pressure

3 Answers  


If a slab concrete is placed with M-20 grade concrete, actually it has to be placed with M-30. what are the rectifications / measures to be taken after concreting is done.

0 Answers   BARC,


how to calculate the steel for rcc slab 1100 Square feet

1 Answers   Jaihind Projects,


where does the hinged action while designing the strture

2 Answers   DLF,


What is the worlds largest concrete dam?

0 Answers  


what is tensile strength?

4 Answers  


Number of cement bags required for concreting 1000 square Feet slab of 4 inch thickness.

12 Answers   Ramky, TATA,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4451)
  • Electrical Engineering Interview Questions Electrical Engineering (16632)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)