at the beam-column junction point tell me how much beam bars
should pass through column ring ? 3 or 2 or 1 . answer with
reason. if it is not happen then what will be he effect ?
Answer / sjtbehera
ok look, there is no ring provided at the junction of
column and beam as per sp46 code. another thing what ever
rod obtain from design of the structure asll bar pass
through the column. please refer sp46 code for your
clearance.
| Is This Answer Correct ? | 3 Yes | 3 No |
What do you mean by bond? What are the different types of bonds?
for 100sft of Cement plastering ratio 1:6 How much quantity of cement and sand required.
6 Answers J.K. Organization, L&T,
trapozidal
How much cement and sand are required for 1 square feet of plaster at a thickness of 15 mm at a ratio of 1:4?
Define What is the tensile strength of wood?
Can a 9" x 24" RCC beam be supported on 18" x 18" RCC beam.
what is the grade of concrete?
what will do when 7days concrete has failed and structure has constructed?
Kindly tell me how much extra steel bars are provided in a RCC roof and distance of bends in different sizes of roofs. Please also tell me that bars provided in chajja are taken seperate or main bars or short bars are extended in chajja. please send me the answer@ suhail_akhter@hotmail.com
What kind of foundations used in block cotton soils
URGENT: please tell me what's normal drawing scale for residential building and commercial building? Thanks.
how to test the quality of bars???
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)