what should be the strength of Concrete cube strength for 7
days, if the designed mix is M20?
Answer Posted / sandeep
If grade of concrete is M20
Then after 7 days it will be 2/3 of 20 n/sq mm
Means 0. 666*20 = 13. 20 n/sq mm
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
what are the Task work of different labour.?
what is the anchorage length of reinforcement.
which red: used in roof teping, then use only cement
what is Quantity of stone and sand required for one cubic meter of stone work (UCR)
we want build 10ft height ,tostore 4 litresof water.what is theground basement for steel andcement andsand.please send us basment calculation?
Explain moment of inertia?
how much is the maximum compressive strength of soil cement and soil-cement-microsilica .
step by step procedure to find out the percentage of steel in coloum,beam,slab,footing in detailed
Define What materials were used to build the Golden Gate Bridge?
What are the applications of the modulus of elasticity?
Describe the role of independent Quantity surveyor?
In the design of bridge arguments what considerations should be made to select the orientation of the wing walls?
what is the productivity in aluminium shuttering per day
What is standard Sand? What is Regime condition? What do you mean by the core trench in Earthen Dasm? What is soundness test for cement? When negetive shear force takes place in a R.C.C member?
What is absolute pressure? How absolute pressure is calculated?