A single line diagram(SLD) and a purchase order of a
11/66kV switchyard of a power plant was given. In the SLD,
only one lightning arrestor(LA) was shown, but the purchase
order had need of 3 LAs. Is this correct, if yes, why?
Answers were Sorted based on User's Feedback
Answer / k.prakashchandra
We have 3 phase Tr ,breaker,G.O.S. but no 3 phase L.A.
| Is This Answer Correct ? | 2 Yes | 2 No |
what is form factor.and rms value..
What facility we get after CT secondary earthing and how?
There are a trformer and an induction machine. Those two have the same supply. For which device the load current will be maximum? And why?
what is neutral plane shift?
why protection meter is always connect to star
what is the difference between RCCB and ELCB?
WHY WE CAN GENERATE POWER IN 3PHASE MODE ONLY NOT IN 4 OR 5 PHASE?
what is the formula for building wiring to get the main breaker.
Define thermal resistance in the context of power amplifier.
in control scheme dc logic wiring commonly using negative loop,what is the reason?if we use positive looping what will happen?
What is the meaning of electricity? How it is being produced? Can we store the electricity? When we produce electricity what is the capacity of voltage current we are getting? If we need 440 volts how to get it? In case, if we want lower than 440 volts how to change it? Please answer?
where used of HVDS system.
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)