A single line diagram(SLD) and a purchase order of a
11/66kV switchyard of a power plant was given. In the SLD,
only one lightning arrestor(LA) was shown, but the purchase
order had need of 3 LAs. Is this correct, if yes, why?
Answer Posted / sakthivel
IT IS CORRECT WE REQUIRED 3 LA IN 3 PHASE
Is This Answer Correct ? | 16 Yes | 2 No |
Post New Answer View All Answers
my name is venkat .i have good percentage in my academics(ssc 86, intermediate 83 b.tech 73) my question 1..after completion of my ssc i joined in bpc but i didnt got rank in emcet so i completed MPC in one year compartmentally ..so here what am expect question from this background?
hi frnz,can somebody give me any project work? i am a 2nd year student & interested in practical works...plz give me some projects
why all the feeders are designed in a particular manner ... is there any reason for that???
i need mat lab program to find out the transmission line losses,regulation and losses
what is data block in plc ? How the values of data block are written and read by hmi ? what is the difference between function and function block ?
PLEASE SEND ME NTPC RELATED INFORMATION LIKE WHICH TOPICS HAV MORE SCOPE,BOOKS TO READ,CUT OFF...PLEASE.mail at thiru.1203@gmail.com
How much depth n width required for laying of 1X70 Sqmm Cable in Desert???
What is the formula to calculate the rating of a three phase miniature circuit breaker
Why space heater is required for each verical bus bar chamber? if one space heater is adequate or not for anti condensation?
Determine the BTU size of an aircon for 20 sq metre room
Air refrigeration cycle works on the
What is the lower limit of break-down voltage of converter transformer.
what is conductor copnstant of ab cable
1.why are not using acb 33kv ht side? is there any problem 2.what is difference between acb,vcb,sf6 breackers? 3.what is the function of invertor and convertor in ups?
What are the advantages and disadvantages of short-pitched winding?