A single line diagram(SLD) and a purchase order of a
11/66kV switchyard of a power plant was given. In the SLD,
only one lightning arrestor(LA) was shown, but the purchase
order had need of 3 LAs. Is this correct, if yes, why?
Answer Posted / sakthivel
IT IS CORRECT WE REQUIRED 3 LA IN 3 PHASE
| Is This Answer Correct ? | 16 Yes | 2 No |
Post New Answer View All Answers
What do you mean by the zone of protection?
what is the synchronous timer ? and it applications.
What will happen if i used 11KV earth ht kit to 11 KV / 11 KV cable termination?
DIFFERENCE BETWEEN NORMAL TRAFO AND THRISTER TRAFO?
why we use sinosidal voltage / current instead of others in system?
state working of halogen lamp?
can any one suggest me the tilt angle of my solar pannel ?? or tell me how can i know the fix tilt angle of my solar pannel?? my cordinates are 31.503629,72.993164.
Can the output voltage of a rectifier be greater than the input AC voltage without the use of any voltage multiplier in the circuit??please provide the explanation too..
In parallel operation time both NGR’s close or not close if both close what will happen
Any one who apply for Ferro Scrap Nigam Limited cn join with me at rajuhalder@indiatimes.com or 09669717028
when we decide to use soft starter drive or vfd drive in mcc to operate apump?
WHAT ARE THE DATAS REQUIRED FOR PROTECTION AND METERING AND CONTROL AND LOGIC PREPARATION,HOW TO STUDY THE PROTECTION AND METERING?
WHAT ARE THE EFFECTS OF SERIES RESONANCE AND PARALLEL RESONANCE ON THE CIRCUITS PARAMETERS?
hi, i finished b.tech eee in 2008, im worked in dg sets mfg company , now i left job in 6months back, now again i want get job core side, how can i get? is there any couses we have learn to get better oppurtunity? /
Use of switch mode power converter in real-time basis?