How much steel required in 900 square feet slab?
Answers were Sorted based on User's Feedback
Answer / dinesh babu
its depends on load (self pluslive load), but its assumed
as 1.5kg to 2kg per sqft
Is This Answer Correct ? | 143 Yes | 37 No |
Answer / goutam ray.
0.8%steel
say, slab thk.100mm.
then, volume of conc. 900*4"=297 cft.=8.41 cum.
require of steel: (8.41*.8%)*7850= 528 kg.
say, slab thk.150mm.
then, volume of conc. 900*6"=450 cft.=12.74 cum.
require of steel: (12.74*.8%)*7850= 800 kg.
Is This Answer Correct ? | 79 Yes | 24 No |
Answer / suresh
USUALLY 1 CUM CONCRETE USING 80 TO 100 KG,
900SQFT SLAB = ASSUME THICKNESS OF SLAB=6"
900*.5=450CFT/35.28=12.755CUM
12.755*100=1275KG
Is This Answer Correct ? | 55 Yes | 18 No |
Answer / suresh
Steel for roof slab = 100 to 120 kg/cum
900sft assume thk 5" =375cft/35.28*120=1275kg
1cum=35.28cft
Is This Answer Correct ? | 26 Yes | 6 No |
Answer / prakash
1st conformer its residential building or commercial 1.5 to 2.0kg/sft and 3.5 to 4.0 kg/sft
Is This Answer Correct ? | 21 Yes | 12 No |
Answer / s.a.ganesh
Has been work out based on design load,live load,wind load,bending moment & SBC of soil. Then calculated the steel
Is This Answer Correct ? | 3 Yes | 0 No |
Answer / nilesh g. shende
Steel depends on size of the beams
if beams are of 230 x 300 then slab will require 1.5 kg/ sq.Ft
if beams are of 300 x 500 then slab will require 3.5 kg/ sq.Ft
Is This Answer Correct ? | 1 Yes | 0 No |
How can you achieve soil enforcement?
how to calculate rate analysys of 1:6 plastering 10 sq m
where will u provide construction joint on slab?
how much the volume of one packet cement ?
How to distinguish that the soil is clay, silt, sand & murrum at site. (just by looking at it with out doing the sieve analysis test??
what is pile cap and why its used ??? why its provided in different shape
How to calculate compressive strength of concrete cube dencity
5 Answers Shoba Devlopers, Sobha Developers,
how to draw road profile
Providing and casting in situ cement concrete M-25 of trap/granite/quartzite/gneiss metal for rcc, Providing formwork,Curing the concrete and Complete. what is rate per Cum. and what is rate for M-30 Grade Concrete.
HOW TO CALCULATE THE CEMENT & SAND REQUIRED FOR 1SQM BLOCKWORK OF 200MM THICK?
why we use aggregate,sand with cement in concrete?
What is stripping?