How much steel required in 900 square feet slab?
Answer Posted / suresh
USUALLY 1 CUM CONCRETE USING 80 TO 100 KG,
900SQFT SLAB = ASSUME THICKNESS OF SLAB=6"
900*.5=450CFT/35.28=12.755CUM
12.755*100=1275KG
| Is This Answer Correct ? | 55 Yes | 18 No |
Post New Answer View All Answers
how to calculate the material from ratio of work PCC, RRM,POINTING, RCC
Formula for calculation volume of essentric footing
what is the water cement ratio? how to calculate it? list the wt. of constructions materials including concrete both ordinary and light wt. concrete
What is the crank length in the slab?
How many feet are in 4 square yards?
Write short note on construction programme for pile foundation.
how the calculation occurs if i want to mix 1cum of M50 concrete. please calculate every ingredients with detail calculation.
how much cement and sand consuptin in 4 inch siporex walls 100 sq ft
what is the difference b/w full length and cutting length?
construction workers how much time take one work or qty
How is calculate the cube molt
How much time Required for PPR pipe network testing
What are the applications of the modulus of elasticity?
What is the mix propotion of M10,M15,M20,M25,M30,M40,M50.M60 cement content,aggrigate,sand and water ratio.
What is the ratio of grades m5, m7.5, m10, m15, m20, m25, m30, m35, m40?