How much steel required in 900 square feet slab?
Answer Posted / prakash
1st conformer its residential building or commercial 1.5 to 2.0kg/sft and 3.5 to 4.0 kg/sft
| Is This Answer Correct ? | 21 Yes | 12 No |
Post New Answer View All Answers
What should be the maximum allowable time for placing ready mix concrete? The specification requires concrete placement within 90 minutes of batching at the plant. What is the significance of this 90 minutes & should this be used as a rejection criterion? What effects does the concrete has after that time period?
How you can turn off the display for dimension in CAD?
while doing the structural works of a simple ground+1 villa, can the columns be continued immediately after neck columns without tie beam, while the tie beam to be done after columns concreting.
How is improve my knowledge in construction industries....
How many are the types of joints?
what is the type of earthing
What is the frequency of sampling for the materials of cement,Fine aggregate, Coarse aggregate .and refer which code
what is mc arther pile?
What is the density of 1:1.5 (Cement:sand) ratio in plaster? And Conversion in 12.5 mm thickness per square meter? Howmany Kg of Cement square meter in ratio of 1:1.5?
How to calculate construction cost of residential building in mumbai
Before casting a basement roof slab which is connected with retaining wall surcharge load (i.e. sand or earth filling) outside the retaining wall is prohibited because of––
kindly mail me by attaching files , formats for quality checks of common building materials like cement , concrete , bricks , sand and aggregates plz send my email id- VMANDAL91@gmail.com
Trapezoidal section footing calculation of Volume & its Area
What is meaning of Canceled/Flat Beam. What is difference between them? Both type of beam can bear same load if size (width)of the flat beam is increases and depth is same as slab thickness? Kindly suggest to me.
what could be the production cost of 1 cum of concrete by CP30 plant