rate analysis of shuttering
Answers were Sorted based on User's Feedback
1) cost of ply what we are going to use for work i.e.,
water proof/commercial and thinck ness depends nature of
work plus 2) wood cost for making i.e type of wood 3)
Making cost 4) fixing&removing 5) P&M 6) No of repetations
are will give the cost of shuttering
| Is This Answer Correct ? | 31 Yes | 10 No |
Answer / kartik
Calculate area of shuttering & multiply with rate of area
of ply.
| Is This Answer Correct ? | 7 Yes | 10 No |
Onsite percentage wastage of Concrete, Rebar, Blockwork/Brickwork, Plaster, Floor tiles ??
what"s the formula to calculate the water for M15 grade concrete?
how much weighs a square feet of slab of 5 inches thick
define silt?
What is softsoil? what kind of foundation?
What is Definition Of Refuse Area In Building ?
1 Answers Arpee Group, Dudhwala Builders,
if a pipe those configuration (ASTM c 76 class b 450mm dia 2500mm length) fixing for water course those lining of water is 7000 running meter. my question is that if 8 joints of pipe ls leakage and we have not permission to stop the water so which treatment we apply on joint in that in condition.
compression strength of first class brick should be
quick sand is a type of sand flow condition occuring in cohesive soil flow condition occuring in cohessionless soil all above
how much the volume of one packet cement ?
what is diffrence between catchment area,watershed and basin?
what we do if excavation is more than actual requirement
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)