What is Definition Of Refuse Area In Building ?
Answer / ram mahidhar reddy
It is the area that can be utilized by people to take shelter in case of hazards (like fire )
This is also termed as temporary shelter
| Is This Answer Correct ? | 0 Yes | 0 No |
IN CIVIL ENGINEERING DESIGN WHY WE ARE USING LIMIT STATE METHOD IS BEST? I THINK WORKING STRESS METHOD IS BEST? EX; FOR COLOUMN DESIGN IN LIMIT STATE METHOD AST IS;1913SQ.MM SAME TIME WORKING STRESS METHOD IS ;2213. SO I THINK WORKING STRESS METHOD IS VERY STRONG COMPARE THEN LIMIT STATE METHOD? MY OPENING IS CORRECT OR NOT? PLS TO EXPLAIN SIRS
how we calculate the vol.of wet concrete..?
how much quantity of sand,cement,reqired for 100sqft of wall construction. And how much quantity required for plastring
1 Answers Jade Software, NSP, TCS,
8. What do you find more useful in your present work – your education or your practical experience from previous jobs or traineeships?
how the calculatio is taken for shuttering in staircase.
1 Answers JMC Projects, Tech Mahindra, TechnoArt,
slump test report
How much area will be covered in 1 litre of Velvet touch paint in normal wall condition
show answer/ calculate-1-2-4 ratio-concrete -cement-sand- metal-water - please brief calculation
weight of 32mm rod/m
Why we do soil classification?
What is meant by solid geometry?
what is the quantity of sand in litre or in cum using 1 bag cement for morter proportion 1:4.is there consider bulking of sand ?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)