what"s the formula to calculate the water for M15 grade
concrete?

Answers were Sorted based on User's Feedback



what"s the formula to calculate the water for M15 grade concrete?..

Answer / fazil

As the density of water is 1. if we multiply the water
cement ratio with the cement being used , we will get the
amount of water. For example if water cement ratio is 0.45
and cement being used is 400 kg per cum, then the water
required will be 0.45x 400=180 litres per cum of concrete.

Is This Answer Correct ?    20 Yes 1 No

what"s the formula to calculate the water for M15 grade concrete?..

Answer / nazeena

0.58 x weight of 1 bag cement = 0.58 x 50 = 29 litres

Is This Answer Correct ?    19 Yes 9 No

what"s the formula to calculate the water for M15 grade concrete?..

Answer / prashanth

.45x one bag of cement ie .45X50=22.5liters.

Is This Answer Correct ?    5 Yes 1 No

what"s the formula to calculate the water for M15 grade concrete?..

Answer / sai sreekanth

the formula for calculating water for m15 grade is
W/C IS 0.5
were w is water content
and c is cement content
the propotion of m15 grade is 1:2:4...for 1 cum
1*1/7 * 1.5 *1440/50
let it be 7 bags then water is 7*50*0.5=7*25=175.......
..........Civil engineer@vision avenues

Is This Answer Correct ?    3 Yes 0 No

Post New Answer

More Civil Engineering Interview Questions

What is the bowing depth after stressing of PSC Girder of various spans and various dia of strands?

0 Answers  


wat is six sigma course ? is it good for civil engineers . wat is pmp certification ? is it good for civil engineers .

1 Answers   CCCL,


how to prepare analysis of hire charges for 62.5 KVA generator

1 Answers  


standard sand use?

2 Answers   ECCI,


Elaborate advantages & disadvantages of using crusher dust instead of sand in rcc work.

0 Answers  






how to calculate cut length of re-bar in a circle . because we not place same length of re-bar in whole circle maximum in center and minimum at corner so how to calculate middle bars???

0 Answers   Student,


what is the cover for column,beam & footing?

6 Answers  


why distibuters used in rcc slsb

4 Answers  


08. 4 main points about check list for Shuttering works are––– 4 i) ii) iii) iv) 09. 4 main points about check list for Concreting works are––– 4 i) ii) iii) iv) 10. 4 main points about check list for Plaster works are––– 4 i) ii) iii) iv) 11. 4 main points about check list for Brick works are–– – 4 i) ii) iii) iv) 12. 3 main points about Project delaying factors are––– 3 i) ii) iii) 13. Write down 60-grade M.S. deformed bar specification. 3 14. 3000 psi concrete means: 1 15. 4 main points about methods of wastage control are–– – 4 i) ii) iii) iv) 16. 1 main point about reasons for your honesty is : 1 17. Water cement mixing in hopper less mixture machine is better than hopper mixture machine because: 1 18. 2 main points about your role during roof casting are–––– 2 i) ii) 19. a. The weight of 3333m deform bar of 24.5 mm dia is…… 1 b. The weight of 300 rft plain bar of dia 1 is……. 1 20. The types of slumps are––– 3 i) ii) iii) 21. 4 main points about the causes of cylinder failure are––– 2 i) ii) iii) iv) 22. Detection of a beam & a girder are–––– 2 i) ii) 23. Curing is needed for–––– 1 24. The types of slabs in respect of size & shape are––– 5 In respect of size: i) ii) In respect of Shape i) ii) iii) 25. The types of Column in respect of size & shape are–– – 9 In respect of size: i) ii) In respect of Shape: i) ii) iii) iv) v) vi) vii) 26. 3 field tests & 3 Laboratory tests of bricks are––– 6 Field tests: i) ii) iii) Lab test: i) ii) iii) 27. 2 field tests & 1 Laboratory tests of sand are––– 3 Field tests: i) ii) Lab test: i) 28. 1 field tests & 1 Laboratory tests of M.S rod are––– 2 Field tests: i) Lab test: i) 29. a. The % of water absorbs by brick chips: …………… 1 b. The % of water absorbs by Stone chips: …………… 1 30. In respect of design: 5 a. The % of strength gains by concrete in 28 days= b. The % of strength gains by concrete in 14 days= c. The % of strength gains by concrete in 07 days= d. The % of strength gains by concrete in 03 days= e. The % of strength gains by concrete in 28 days without curing =

3 Answers  


How to Calculate Materials Required for PCC 1:4:8 for 1Cum & Brickwork 1:4 for 1Cum & Plastering 1:4 (15mm Thick) for 100Sqm & RCC 1:4:8 & 2mt ( L1=1mt & L2=1mt ) length of 12mm Steel bended in 90degrees what is the formula to calculate Weight & Actual Length ?

0 Answers   Nespak, Xebec,


what is the factor of safety for cement and steel with reference to IS 456-2000. and min reinforcement should be provided for column and slab with reference to IS 456-2000.

5 Answers  


plz tell me the compresive stength of genral con. & foam con. all grade after 7,14,21,28 day

1 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5084)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4451)
  • Electrical Engineering Interview Questions Electrical Engineering (16631)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1094)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)