If you don’t have coal, salt and copper, then how would you
earth your connection temporarily at a campus site?

Answers were Sorted based on User's Feedback



If you don’t have coal, salt and copper, then how would you earth your connection temporarily at ..

Answer / udayak25

Then u can (1)connect earthing wire to the GI water
pipeline.
(2)or connect to building structural bars.
for these any how check once bcoz there may be
disconnection in bars or pipe.
(3) one more is take a bar of MS & burry it around 1ft below
GL, and
connect earth wire but be sure the soil should wet all time.

Is This Answer Correct ?    4 Yes 0 No

If you don’t have coal, salt and copper, then how would you earth your connection temporarily at ..

Answer / guest

then we put every day water

Is This Answer Correct ?    2 Yes 3 No

Post New Answer

More Electrical Engineering Interview Questions

Why material of brush is carbon in motors why not other material.

5 Answers   NTPC,


Differance between ELCB and RCCB?

8 Answers  


What difference between ref protection and differential protection ?

0 Answers   EPC, INEL Power System Engineers,


Hello sir i m student of gtu .what is idp.

0 Answers  


Why do we have 110V, 230V, 415V etc. in electrical transmissions? Why not 100V, 200V,400V?

4 Answers  






We have one Energy meter for Measuring the voltage,current,power,energy(KWH,KVARH,KVAH) & power factor.The problem is that the meter does not show whether the PF is lagging or leading.So i want to know that is there any way or calculation to find out that whether the PF sign (lagging or leading) depending upon the above mentioned parameters?

4 Answers  


why capacitor using the induction motor?

5 Answers  


why rating of generator is kva but motor is kw ?

4 Answers  


What is the name of transformer oil?

18 Answers  


what is the function of choke in tube

1 Answers  


Witch do depand of Power factor and theory of power factor?

0 Answers  


can anyone pls expain me about how can we design a cable tray??suppose if have to draw a 3 nos of 50 sqmm AYFY and 2 nos of 35 SQmm of AYFY cable through the tray..how can we design the tray size?? regards...

3 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4451)
  • Electrical Engineering Interview Questions Electrical Engineering (16632)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)