What is the graphical relationship between
N - Value of soil and Dia. of pile when pile length is
fixed, and
n - Value and length of pile when its dia. is fixed.
how cubic feet cement,sand,aggregate required for 1 cubic feet ratio=1,1.5,3
very simple or less time consuming formula for reinforcement calculation by moment
1.Why we are preferring 43 grade cement than 53 grade cement. 2. Approximate cost difference between 43 and 53 grade cement. Thanks.
what is the multiplying factor for diffrent types of pcc/rcc ratios?
how to find no bar in 1 length
HOW MANY CEMENT BAGS ARE REQUIRED FOR 1m^2 PLASTERING AREA?
HOW TO CLACULATE CEMENT AND SAND CONSUMPTION FOR THE STAIRCASE KOTA FLOORING IN THE RATIO OF 1:4 50 MM THICKNESS
Differentiate orthographic and isometric projections?
In two way slab where should we stop the work at end of the day?
TELL US ABOUT A TIME WHEN YOU FAILED TO MEET A DEAD LINE. WHAT WERE THE REPERCUSSIONS?
bend deductions for reinforcement for wall
Define What is passive earth pressure ?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)