WHAT IS TEAM SIZE IN CONSTRUCTION WORK
Answers were Sorted based on User's Feedback
Answer / vikram syal
its depends upon how much big work of construction.
| Is This Answer Correct ? | 9 Yes | 1 No |
what is ment by surveying?
i know that, the for calculating material required for concrete volume of concrete is taken 50-54 % more for wet volume. i have querry is that cement and sand volume taken more for making wet volume but in the case of aggregate why it is taken more there is no change in aggregate whether it is dry or wet.???? can you give me answer for this???
How to estabilish reinforcement Steel rolling margin for a building projects ?
how to caliculate required amount of cement and sand required for 1cu.m.
how many moisture content in well seasoned timber
how much kg of binding wire is used in slab ?
how to calculate the quantity of steel in a slab , beam and coloumn
During reclamation how can the occurrence of mud waves can be rectified?
Give list of building construction equipment & explain about them in brief. How much is output of JCB, POCLAIN, Steel cutting & bending machine, material hoist, tower crane?
what is meant by shear center?????
how many brick sand cement require (1:5) 1 cum
What is Bearing Capacity of Soil? How will you calculate for a particular type of Soil?
5 Answers Nagarjuna Construction,
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)