Answer / loboreliance2003
Actually the question should be why is the capacitor bank
connection to be removed from the motor before taking the
no load test. This has nothing to do with capacitor of
motor. 3Ph induction motors dont have capacitors to
start.These are only used for single phase motors.
The answer is that capacitor bank is provided on any
Inductive load due to power factor dipping to below0.8 and
sometimes even to 0.5. To improve the power factor we have
to connect the capacitor banks depending on the size of
motor.
But if motor is not run on load then it is not necessary to
connect the capacitor. Hence no load tests can be done
without having to connect the capacitor bank to the motor.
the other reason is that there is danger of over voltage
due to capcitor being connected then PF will be greater
than 1 which could damage the motor windings. I have faced
these motor burning problems due to this reason.
| Is This Answer Correct ? | 8 Yes | 2 No |
Answer / mukesh.k.sharma
plz send me ans on my mail id
mukesh.k.sharma@adityabirla.com
| Is This Answer Correct ? | 5 Yes | 2 No |
Answer / baskaran
no need to capacitor in 3phase induction motor.
if capacitor used means improve the powerfactor only..
| Is This Answer Correct ? | 3 Yes | 1 No |
Answer / abhinav
i am not seen 3 phase induction motor require capasitor.
| Is This Answer Correct ? | 3 Yes | 2 No |
Answer / mas tachnocrat
hmm 3 phase inductin motor needs a capacitor; to improve
power factor or if u want to start 3 phase induction motor
from 2 phase
or noload test main capacitor kya kare gaa
| Is This Answer Correct ? | 2 Yes | 2 No |
Answer / raju
3 ph induction motor doesn't require any capacitor.in 1 ph induction motor require capacitor to divide a phase into two (as per double revolving field theory)so there is no need of capacitor
| Is This Answer Correct ? | 1 Yes | 1 No |
how to find out three phase motr kw with out name plate..
What is meant by soft starter used in motors?
whether choke act as a voltage regulator in tubelight or not?
1)which height building required lightning arrester? 2)how to calculate the requirement of lightning arrester? 3)what is the pro instrument? 5)how to test protective relay like overload?earth fault relay?
Why temperature rise test is conducted in bus bars and Isolators?
If anyone would like to know or practice for FEWA papers contact me on mohamedrashad2@hotmail.com Just completed the supervisor exam in April 2021
how to can we synchronize different capacity of DG sets.60kva& 250kva?
A 3-phase IM is supplied from 50 Hz system. It runs at speed of 1440 rpm and slip equal to 4 %. Calculate number of pole pairs. A 1 B 6 C 2 D 3
if we use a normal natural thundering; than approx how much amount of electricity we generate?
how we can calculate 2 phase welding transformer rating or total power?
how to reduce disel generator voltage from 410-60 hz to 380v-60hz
how to determine the cable size...pls explain me with the formula taking particular load....does the factors like impedance & short circuit rating influence the cable size, if so how....
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)