How amny AH battery required for 600va inverter ?And how
many hours it will give backup for ceiling fan ?

Answers were Sorted based on User's Feedback



How amny AH battery required for 600va inverter ?And how many hours it will give backup for ceiling..

Answer / parameshwar reddy

180AH bATTERY IS REQUIRED.
IF IT IS 72W CONSUMED FAN IT WILL GIVE 30HRS. BACK UP

Is This Answer Correct ?    7 Yes 7 No

How amny AH battery required for 600va inverter ?And how many hours it will give backup for ceiling..

Answer / gaja

Baside on your required time for back up up to 15 Hours
the battery will get veries

Is This Answer Correct ?    0 Yes 1 No

How amny AH battery required for 600va inverter ?And how many hours it will give backup for ceiling..

Answer / jp

min 120AH/12V.
if we consider fan load = 72W, then it will run for 11 hrs.

Is This Answer Correct ?    0 Yes 4 No

Post New Answer

More Electrical Engineering Interview Questions

explain the details about vaccum circut breaker and advantages?

4 Answers   CPCL, Unisol,


Is there a standard depth of gravel fill in Substation Switchyard? Please give a design/drawing. Thank you.

0 Answers  


What is the dimension of A4 sheet in mm?

6 Answers   Bhel,


please write motor, transformer, Generator setting, fault level calculation of Tr.etc

0 Answers  


what is effect of length of air gap on performance of dc motor and generator?

0 Answers   DEI,






Two alternators say 1 & 2 are poised to parallel operation. But at the time of paralleing alternator 2 gets out of the system by tripping Earth fault relay. Please send me reply why this is happening?

2 Answers  


after syncnhronistion how generator speed controlled by grid

3 Answers  


what to do with nuetral when Generators are running in parrellel

11 Answers   APTransco,


how hydrogen cooled alternator undergo maintanence ? that is hydrogen when come in contact with air can result into explosions .

0 Answers   DVC,


How to calculate energy stored in a capacitance

0 Answers  


Assuming that a dedicated neutral earthing transformer is provided for each GT generator, when the two generators are running in parallel, has consideration been given that the earth fault current from one generator stator winding be split between the two neutral earthing transformers? If so, what adverse impact will this have on the operation of the 59N and 27TN devices?

0 Answers   Quest,


What is the latest generation of circuit breakers called?

3 Answers   Epitome, Focus Energy, Jakson, KDC, L&T,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4452)
  • Electrical Engineering Interview Questions Electrical Engineering (16632)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)