how much quantity a carpenter do shuttering per day
Answers were Sorted based on User's Feedback
Answer / sachin
a carpenter can do 3 to 4 sq m shuttering per day
| Is This Answer Correct ? | 256 Yes | 57 No |
Answer / nitin adate
Actually Shuttering output is depend upon type of
structure,height of structure, slab to slab height,shape of
structure, type of shuttering & most important availability
of skilled labour.But for planning purpose 2.5 to 3.00
sqmt /per day ( 1Skilled Carpenter + 2 helper ) is
reasonable value.
| Is This Answer Correct ? | 106 Yes | 31 No |
Answer / aijaz hussain, modi builders
The Out-turn of a Shuttering carpenter per day is between
2.5 sq.m. to 3 sq.m.
| Is This Answer Correct ? | 64 Yes | 27 No |
Answer / m md ali
Formwork-Footings, foundations, ground- Sqm 8
Formwork-Columns, pedestals- Sqm 6
Formwork-Beams and slabs -Sqm 8
Formwork-Tie beams, arches, lintels.
Formwork-Walls- Sqm 12
Formwork-Circular, special shapes -Sqm 4
Formwork- Making timber shutters -Sqm 8
| Is This Answer Correct ? | 31 Yes | 3 No |
Answer / uday gandhi
1CARPENTER + 2 HELPER SHALL GIVE OUTPUT OF 11 SQUARE METERS IN 08 HOURS OF WORK.
| Is This Answer Correct ? | 92 Yes | 67 No |
What is the difference between dumpy level and auto level.
Why is DPC not provided at sills of doors?
Name the main components of a cad gui?
How many Sft of Level Plaster per Kg
how much lap we should provide in columns for Fe-500?
What is called dummy column, & what its uses ?
where will u provide construction joint on slab?
I have a slab of 20cm thickness of 20m by 4m in wich we are installing 15 tons electric panels , and we have put 4 H-shaped columns under the slab but we have done many cores in the slab which seems very normal , can you help me by telling me how to calculate the bearing capacity of the slab or give me an idea if i should increase more columns Note: load distribution area 12*1.5 m2
0 Answers First American Corporation, GS Infra, L&T, Real Sociedad,
What is Grid floor and mention its advantages ?
a) we have 30nos., 300mm dia, 4m length double under reamed piles.calculate excavation quantity.b) tell concrete qty. also.
What is meant by dimensioning?
What are the methods of measurement? Describe it shortly
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)