how much quantity a carpenter do shuttering per day

Answer Posted / sachin

a carpenter can do 3 to 4 sq m shuttering per day

Is This Answer Correct ?    253 Yes 57 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

how to calculate the crushing strength of cement concrete paver blocks 100x100x60 mm thich.

1488


how to calculate the density for high density concrete ? or is it same as the density of RC?

1865


Explain what is change order request?

669


How foundation is designed, Column design and beam design

1848


How much quantity water should be placed in one cubic meter area?

883






Before casting a basement roof slab which is connected with retaining wall surcharge load (i.e. sand or earth filling) outside the retaining wall is prohibited because of––

1788


How to improve the strength of fly ash bricks to avoid corner damge? How to get the color lighter similar to normal concrete blocks/

1346


what is relation between SPT N value and driving piles after conducting a soil test?

1565


Define What is rigging?

614


1.what type of the rock is most suitable for wet mix macadam in construction of road? 2.what is the highest maximum dry density and optimum moisture content can be acheive by using most suitable crush rock?

2014


quantity of sand and cement for 10m2 plastering 10mm thick for the ratio of 1:4,1:3and its leabour data

2729


Can we weld hot rolled steel ASTM A615 ? Please Give the detail answer please thanks alot

1813


material used for mendrel use to bend epoxy coated rebar

1689


how to calculate 1:5:8 ratio concrete cement, sand, metal and water please give me brief calculation

1200


How to arrive d*d/162 , for finding the kg per meter , wt of steel

1388