how much quantity a carpenter do shuttering per day
Answer Posted / nitin adate
Actually Shuttering output is depend upon type of
structure,height of structure, slab to slab height,shape of
structure, type of shuttering & most important availability
of skilled labour.But for planning purpose 2.5 to 3.00
sqmt /per day ( 1Skilled Carpenter + 2 helper ) is
reasonable value.
| Is This Answer Correct ? | 106 Yes | 31 No |
Post New Answer View All Answers
Can we use the flyash bricks in brick bat coba?
what happening if we casting HV shunt reactor foundation pad at 50cm height different time (One day difference)
Where can I get a Text Book on Design of Blast Resistant Buildings in PDF form.
Why is the statue of liberty made of copper?
what is work of planning deptt. in any construction compny (in road project)
what is the difference between np2 and np3 concrete mix
from one meter cube of stone masonry structure how much cubic meter of cement mortar we use as our estimation 25-30% is that correct for estimation of quantity of sand and cement(2:1) proportion of mortar
What is the difference between linear dimension and aligned dimension?
silt%= silt volume/ silt+sand volume is this right?
how much concrete solid/hollow block are manufacture per 50 kg cement bag in differnent sizes like 400x200x200mm, 400x200x150mm, 400x200x100mm. And need proper ratio as per sale quantity. pls send my mail mathi7599@gmail.com searching last two years not yet get pls find and enclosed pls. need practical analysis.
how many men days of loburs and masons are requirete for 1 cum,pcc (1:2:4),Pcc(1:3:6) and Pcc(1:4:8) thanking you
que.is ideal size of bricnk use in india,joint size of mortar in massinary ,how many bricks used in 1cum.how to test at site.what is the possition of marka used in bricks?
Can someone please be curing period of the following according to IS codes Column beam slab brick masonry raft found. and also tell how many hours/day
Please tell me vasthu room sizes. Thanks.
how to calculate the material from ratio of work PCC, RRM,POINTING, RCC