Which buffer solution is used for PH transmitter calibration?..

Answer / satyajit sahani

Hi,
For pH transmitter you can use buffer solution in betwen
your pH sensor range.But when you are going to calibration
use buffer solution 7.00(Neutral)then any solution from
either Acid side(4.01)or alkali side(10.0)

Is This Answer Correct ?    4 Yes 0 No

Which buffer solution is used for PH transmitter calibration?..

Answer / a.mondal

Phosphates buffer solution is used

Is This Answer Correct ?    2 Yes 1 No

Which buffer solution is used for PH transmitter calibration?..

Answer / srinivasan

we are using the 4.7 10.based on the configuration like 4 to
20 ma.if 4 ma means 0 and 20 ma means 10.when we using the
ph 10 it will get 20 ma..

Is This Answer Correct ?    2 Yes 7 No

Post New Answer

More Instrumentation Interview Questions

what is compensation in engineering and what is temperature compensation?

1 Answers   Binani, Yokogawa,


when i installed Allen_bradley_RsLogix_500_Pro_V_7.0,after installation it gives the fatal error.it need activation file.from where and how i can find its activation file.

6 Answers  


How can we loop powered for a transmitter.How we can do wiring

1 Answers  


why we use 0.2 to 1.0 kg/cm2 output in control valve

4 Answers   GNFC,


WE Know that different supply voltage of solenoid valve like 24,110,220 etc..how we check the solenoid supply is 24v or 220 NOTE: No specification at device.

2 Answers   OMV,


this site is owned by an nonsense

0 Answers   Bhel, Prolific,


what r all the closed loop used in boiler? for this related tell some web address..

3 Answers  


How u will setup SPI(2007) on Citrix Server (Thin Client Mode)? Plz Justify?

1 Answers  


Why we use mmwc unit for pressure

3 Answers  


Instrumentation engineer please reply me,I am electrical engineer ,what is the future in instrumentation dept {presently working (P&ID) Design} for me,whether good future for me as instrumentation department.what side can i get job in future

3 Answers  


Basic working principle of control valves

1 Answers  


there is one orifice plate already installed on 3" line, but my previous engineer(who is not working here) removed that tx, but now i want to take it in to the process, so now what i have to do now? flow fluid is hytherm oil of temp. 260deg & pressure is 3bar.

2 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4453)
  • Electrical Engineering Interview Questions Electrical Engineering (16638)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)