tell me quantitys of matal, sand and cement in 1:4:8 and
1:2:4
Answer Posted / mask
* In 1:4:8
Cement - 1.25 Cft
Sand - 5 Cft
Matal - 10 Cft
*In 1:2:4
Cement - 1.25 Cft
Sand - 2.5 Cft
Matal - 5 Cft
| Is This Answer Correct ? | 45 Yes | 10 No |
Post New Answer View All Answers
Providing ,Cutting, bending and positioning of TMT Bar with cost of binding wire
as per is code, what is the minimum content of opc and ppc cement for rcc structure
What is the use of array command?
What is the cost difference between site mix and ready mix concrete per cubic meter
What do you understand by “preset” during the installation process of bridge bearings?
punj loyed and sapurjl palanjl
in one SQM plaster how much Cement and sand consumed in ratio 1:4
There are two buildings one taller and one shorter whose time period will be grater and similarly the frequency ?
minimum number of bars in a beam? minimum and maximum column size and beam size ? minimum and maximum aggregate size used in multistorey residential building for columns,beams,slabs?
how much of the strength comes from post-production curing
how to decide the mortar ratio 1:4,1:6 in masonry? same in plaster 1:3 and 1:4? which code or any document reference taken to define proportion?
Maximum cement content in 1cum for RCC and PSC? (please give IS,IRC referance?
Why does the pressure increase under soil?
What is hybrid foundation?
How many days should curing of plastering, brick work and concrete