tell me quantitys of matal, sand and cement in 1:4:8 and
1:2:4
Answer Posted / surya v kuchibhotla
If you are considering 1:4:8; per each cubic meter you have
to arrive the quantities as under.
If 1+4+8= 1cum (dry mix); then
cement quantity will be 1/13 = 0.077 cum;(2.2 Bags of 50kg)
Sand Quantity will be 4/13= 0.31 cum and
the Quantity of Coarse aggregate shall be 8/13=0.62 cum.
But, the volume of dry concrete will be 1.5 times
(approx)the volume of wet concrete. So, if you want to
prepare a cum of wet concrete, multiply the above values by 1.5.
Is This Answer Correct ? | 90 Yes | 21 No |
Post New Answer View All Answers
Give me an example of a time when something you tried to accomplish and failed.
how to shuttering is used in slab
How to plan a project
what is kribs is supporting?
on what basis the partial factor of safety are decided? form the load combinations
please briefly explain calculating or estimating steel quantity for a RCC column?
How can i display 5 asterisk and another 5 asterisk )?
how many monpower required for 1 sqm normal RCC structure ( includes finishes & MEP )
How to estimate the shuttering material requirement for a slab and beam and shear wall..? Please send thumbrule to estimate material required ( Plywood, Ms plates, runners, acrospans, jacks)
how i convert mm into standard wire guage (SWG)no.
Why reinforcement done in shorter span in two way slabs
Cement consumption of one cubic meter of aerocon blocks masonry?
satart to end steps by step process of building construction...? i want to planning theme accuretly
What distance in meters on the ground is the equivalent of one second of arc in longitude or latitude?
how to calculate the strength of rebound hammer test reading in building construction ?