tell me quantitys of matal, sand and cement in 1:4:8 and
1:2:4

Answer Posted / surya v kuchibhotla

If you are considering 1:4:8; per each cubic meter you have
to arrive the quantities as under.
If 1+4+8= 1cum (dry mix); then
cement quantity will be 1/13 = 0.077 cum;(2.2 Bags of 50kg)
Sand Quantity will be 4/13= 0.31 cum and
the Quantity of Coarse aggregate shall be 8/13=0.62 cum.

But, the volume of dry concrete will be 1.5 times
(approx)the volume of wet concrete. So, if you want to
prepare a cum of wet concrete, multiply the above values by 1.5.

Is This Answer Correct ?    90 Yes 21 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Give me an example of a time when something you tried to accomplish and failed.

2492


how to shuttering is used in slab

1317


How to plan a project

1717


what is kribs is supporting?

1594


on what basis the partial factor of safety are decided? form the load combinations

1807






please briefly explain calculating or estimating steel quantity for a RCC column?

1440


How can i display 5 asterisk and another 5 asterisk )?

2076


how many monpower required for 1 sqm normal RCC structure ( includes finishes & MEP )

2221


How to estimate the shuttering material requirement for a slab and beam and shear wall..? Please send thumbrule to estimate material required ( Plywood, Ms plates, runners, acrospans, jacks)

1736


how i convert mm into standard wire guage (SWG)no.

2593


Why reinforcement done in shorter span in two way slabs

1374


Cement consumption of one cubic meter of aerocon blocks masonry?

3669


satart to end steps by step process of building construction...? i want to planning theme accuretly

1445


What distance in meters on the ground is the equivalent of one second of arc in longitude or latitude?

647


how to calculate the strength of rebound hammer test reading in building construction ?

2882