tell me quantitys of matal, sand and cement in 1:4:8 and
1:2:4

Answer Posted / kailash

1:2:4 & 1:4:8 its not a standard design. design depends
upon the which aggregate available at site and there
density.

Is This Answer Correct ?    10 Yes 10 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

A super elevation of 60 cm has been provided on a 8m wide road and a curve of 260m radius .calculate the max.speed in km/hr of the vehicle that can be negotiated safely? Plz answer with full solution.thanx

1353


IS STEEL BARS IS AS PER ISI TRANSVERSE RIBS SHOULD BE UNIFORM IN DISTANCE, PLEASE EXPLAIN WHY,

1816


How can you distinguish between sorption, absorption and adsorption?

750


Please let me know about answer for my Question as "What is the maximum wastage allowable of HYSD Steel in any Bridge project as per Code and Code reference also ?

1440


rate analysis for cement pointing 1:4 , for 100 sq m

3696






What are the advantages and disadvantages of lead products in construction?

740


how many digree of freedom in four bar chain

1919


i have a interlock pavement work.i need to compact about 2000 sq metres of sub base grade c of thickness 15 cm.what is the amount of water required for compaction ??

1642


Can someone please be curing period of the following according to IS codes Column beam slab brick masonry raft found. and also tell how many hours/day

1587


material required for construction of 1cu.mtr wall (Cement, No of bricks (Brick size 40cm x 20cm x 10cm),sand,Quantity of water

3252


I have an plot with area 35*47 = 182.77 sq yards. Out of this iam planning to construct house with 1350 sqfeet each floor .iwanted to build a G+2 house.Need cost estimation for each item

1407


What is the significance of cost estimate knowledge for an architect?

1148


mean of NH4 pipe

2113


What is Curtailing of R/F

1981


.5Ast

1344