tell me quantitys of matal, sand and cement in 1:4:8 and
1:2:4
Answer Posted / kailash
1:2:4 & 1:4:8 its not a standard design. design depends
upon the which aggregate available at site and there
density.
| Is This Answer Correct ? | 10 Yes | 10 No |
Post New Answer View All Answers
What is Critical path in Ms-Project ?
What ingredients with% found in ppc cement??
What is the difference between Fe 500, Fe 500 D and Fe 515.
While doing civil foundation of machinery. How will you process for it? & We also fixing plates at top surface of foundation, then what is the procedure?
which are the Indian auther books for STONE COLUMN/GRANULAR PILES?
material used for mendrel use to bend epoxy coated rebar
What is the Null Point of chimney in Power Plant
What is the use of water table & Kreb stone for drain
how to calculate testing date
how many sqft or cft of work done by a mason per day in all works such as brick,block,concrete,shuttering carpenter,reinforcement fabricator,painter,door window carpenter.....everything thank you
Why should appointment store person for project ? what is the benefits for company ?
how many men days of loburs and masons are requirete for 1 cum,pcc (1:2:4),Pcc(1:3:6) and Pcc(1:4:8) thanking you
how to calculate rate analysys of 1:6 plastering 10 sq m
Formula of area of crane hook
what is difference between fluidity and workability also how palsticizer works